Express® Lavatory System SS-Series
Installation - Obsolete SS-3/AST/WH97TAS
5
Bradley Corporation • 215-1240 Rev. E; EN 08-805 4/24/08
Installation Instructions
Step 1: Rough in
Note: See Figure 1a (below) and Figures 1b and 2 (on page 6) when roughing in the Express®.
IMPORTANT: Flush the supply lines before making connections. Debris in supply
lines will cause the valves to malfunction.
IMPORTANT: Dimensions shown in Figure 1a are for Juvenile Height grades Pre-K
thru 5 or 6, and in Figure 1b for Juvenile Height grades 6 thru 8 or 9.
1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.
2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.
3. Install (10) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by
installer) at the locations shown in Figures 1a and 1b.
NOTE: The anchors will be used to mount the Express® bowl and frame to the wall.
Figure 1a
Installation Instructions continue . . .
SS-3/AST/WH97 Express® Lavatory System Dimensions
Juvenile Height Mounting (Grades Pre-K thru 5 or 6)